The project comprised the provision of a new purpose built dispensary and refurbishment of the manufacturing facility for branded medicines. Envair led on the installation of four downflow booths in the new dispensary, each of which featured integrated weighing and computerised dispensing systems. The new DB Touch model came complete with touchscreen control, self monitoring and automatic adjustment, whilst another booth from an existing site was upgraded with new sidewalls. A further two booths were reused from the old dispensary on the site.
Envair’s team of engineers dismantled the booth from the existing SSL site, relocated it to the new dispensary in Peterlee and then commissioned and validated all four booths. The total turnkey package was valued at £415k.